		Major Performance
		
												- 
				 
 
					Korea Myeongdong Marina Seawall / DCM
						- 
							Period
							2014.08 ~ 2015.09
						
- 
							Client
							Changwon-si, Gyeongsangnam-do
						
- 
							Location
							Changwon-si, Gyeongsangnam-do, Republic of Korea
						
- 
							Explanation
							Off-Shore DCM
 (Long Pile) : 26,163M
 (Short Pile) : 8,863M
 
 
- 
				 
 
					Qatar Doha Metro Integrated Railways Project(Red Line South)/Shield Tunnel
						- 
							Period
							2014.07 ~ 2016.12
						
- 
							Client
							Qatar Railways Company
						
- 
							Location
							Doha, State of Qatar
						
- 
							Explanation
							EPB, Length-10,864(M), Diameter-6,800(mm), Ground: Lime Stone, Midra shale
						
 
 
- 
				 
 
					Korea Site B construction of Centum City / Underground Passage Work
						- 
							Period
							2014.06 ~ 2016.06
						
- 
							Client
							Busan, Republic of Korea
						
- 
							Location
							Centum Shinsegae Department Store
						
- 
							Explanation
							Earthwork
						
 
 
- 
				 
 
					Korea Jangmun Nature Gas Power Plant Underground Transmission Cable Tunnel/Shield Tunnel
						- 
							Period
							2014.06 ~ 2016.08
						
- 
							Client
							SK E&C
						
- 
							Location
							Paju, Gyeonggi-do, Republic of Korea
						
- 
							Explanation
							Shield Tunnel
						
 
 
- 
				 
 
					Myanmar Daewoo Amara Hotel Project
						- 
							Period
							2014.05 ~ 2015.12
						
- 
							Client
							Daewoo E&C
						
- 
							Location
							Yangon, Myanmar
						
- 
							Explanation
							Earthwork, Bored Pile
						
 
 
- 
				 
 
					Malaysia Cooling Water Intake System for Fast Track 3A Project in Manjung/Shield Tunnel
						- 
							Period
							2014.04 ~ 2016.08
						
- 
							Client
							TNB (TENAGA NATIONAL BERHAD)
						
- 
							Location
							Perak, Malaysia
						
- 
							Explanation
							DCM, D-Wall, Steel Caisson, TBM Diameter 6,750(mm)