Major Performance
-
Korea Sosa-Wonsi Double Track Railway 4-3(Tunnel/Open)
-
Period
2012.01 ~ 2018.04
-
Client
E-Rail
-
Location
Ansan, Gyeonggi-do, Republic of Korea
-
Explanation
Main Tunnel(500m)
Main Excavation(543m)
-
Korea Seoul Subway Line No.9 Section 922 Construction/Earth Work and Structure Work(Phase 3)
-
Period
2012.01 ~ 2018.12
-
Client
Seoul Metropolitan Government
-
Location
Seoul, Republic of Korea
-
Explanation
Main Tunnel : 962m (Top&Bottom), Length 167.8M
-
Korea Gimhae LNG Cryogenic Technology Plant Construction Works
-
Period
2012.01 ~ 2014.07
-
Client
Gyeongnam Technopark Industrial Co., Ltd.
-
Location
Gimhae, Republic of Korea
-
Explanation
Construction area : 147,000㎡
Vacuum preloading : over 70kPa
-
Singapore DTL STAGE3 C923 Dwall & Pilling
-
Period
2011.12 ~ 2017.06
-
Client
LTA
-
Location
Singapore
-
Explanation
DWall 61,840㎥, SBP(D1000) : 106 bone
Bored-Pile(D600~1600) : 386 bone
-
Korea Gwangan-dong Sewer new (expansion) construction
-
Period
2011.12 ~ 2018.05
-
Client
Busan Metropolitan City
-
Location
Busan, Republic of Korea
-
Explanation
New Sewerage and Drainage Facilities
Pipe construction : 17,190m
Outdoor pipeline : 33,968m
-
Korea Hanam-Misa Uptown Construction(Section 1)
-
Period
2011.11 ~ 2016.12
-
Client
Korea Land & Housing Corporation
-
Location
Hanam, Gyeonggi-do, Republic of Korea
-
Explanation
scaffolding Dismantlement (Demolishment), area : 5,463,000m2