Korea Saemangeum New Port construction of temporary dike and reclamation dike
Period2018.07 ~ 2019.05
ClientGunsan Regional Office of Oceans and Fisheries
LocationGunsan, Jeollabuk-do, Republic of Korea
ExplanationTemporary dike 845m
Reclamatoin dike 800m
Rear reclamatoin dike 1,245m
Korea Gangneung Anin Thermal Power Units 1 and 2 Construction / Drainage Tunnel and Vertical District Construction
Period2018.05 ~ 2022.08
ClientG.E.P
LocationGangneung, Gangwon-do, Republic of Korea
ExplanationSHIELD TBM 2 (Slurry) L=1.831m
- Excavation diameter : D=8,410 mm
- Water intake tunnel : L = 915m
- Drainage tunnel : L = 1,095 m
a vertical area
- Water intake vertical part Φ15.8 x 49.9m
- Drainage vertical outlet Φ15.8 x 48.2m
Singapore THOMSON EAST COAST LINE T307
Period2018.03 ~ 2021.04
ClientLTA
LocationSingapore
ExplanationTotal excavation extension: L = 2,690 m (3 EPB TBMs)
- Excavation diameter: D=5,800 mm
Two evacuation channels, one collection channe