Major Performance

  • Korea Myeongdong Marina Seawall / DCM

    • Period 2014.08 ~ 2015.09
    • Client Changwon-si, Gyeongsangnam-do
    • Location Changwon-si, Gyeongsangnam-do, Republic of Korea
    • Explanation Off-Shore DCM
      (Long Pile) : 26,163M
      (Short Pile) : 8,863M
  • Qatar Doha Metro Integrated Railways Project(Red Line South)/Shield Tunnel

    • Period 2014.07 ~ 2016.12
    • Client Qatar Railways Company
    • Location Doha, State of Qatar
    • Explanation EPB, Length-10,864(M), Diameter-6,800(mm), Ground: Lime Stone, Midra shale
  • Korea Site B construction of Centum City / Underground Passage Work

    • Period 2014.06 ~ 2016.06
    • Client Busan, Republic of Korea
    • Location Centum Shinsegae Department Store
    • Explanation Earthwork
  • Korea Jangmun Nature Gas Power Plant Underground Transmission Cable Tunnel/Shield Tunnel

    • Period 2014.06 ~ 2016.08
    • Client SK E&C
    • Location Paju, Gyeonggi-do, Republic of Korea
    • Explanation Shield Tunnel
  • Myanmar Daewoo Amara Hotel Project

    • Period 2014.05 ~ 2015.12
    • Client Daewoo E&C
    • Location Yangon, Myanmar
    • Explanation Earthwork, Bored Pile
  • Malaysia Cooling Water Intake System for Fast Track 3A Project in Manjung/Shield Tunnel

    • Period 2014.04 ~ 2016.08
    • Client TNB (TENAGA NATIONAL BERHAD)
    • Location Perak, Malaysia
    • Explanation DCM, D-Wall, Steel Caisson, TBM Diameter 6,750(mm)