Major Performance

  • Singapore PUB D1200 Pipeline

    • Period 2017.06 ~ 2018.09
    • Client PUB
    • Location Singapore
    • Explanation Slurry, LENGTH-1,636(M)
      DIAMETER-ID3.8m
      GROUND : Soft & Hard rock
  • Korea Busan New Port 2-4stage Container Pier Infrastructure in Private Investment

    • Period 2016.12 ~ 2017.10
    • Client Busan Regional Office of Oceans and Fisheries
    • Location Busan, Republic of Korea
    • Explanation DCM, Length 136,811m
  • Hong Kong Three Runway System Project 3201-DCM Testing&Sampling

    • Period 2016.08 ~ 2018.01
    • Client Hong Kong International Airport
    • Location Hong Kong
    • Explanation Marine Ground Survey , DCM coring, Indoor test
  • Hong Kong HKIA 3RS PJ DCM

    • Period 2016.07 ~ 2018.01
    • Client AAHK
    • Location Lantau, Hong Kong
    • Explanation D=1300mm*4 drivers
  • Korea Busan Construction of Deep Sea Marine Engineering Water Tank

    • Period 2016.07 ~ 2019.01
    • Client KOREA RESEARCH INSTITUTE OF SHIPS & OCEAN ENGINEERING
    • Location Busan, Republic of Korea
    • Explanation Length : 100m, Width : 50m, Depth : 50m
  • Singapore TEL T313 Soil Investigation

    • Period 2016.06 ~ 2020.12
    • Client LTA
    • Location Singapore
    • Explanation Ground investigation : 542, DSM Coring : 1,216, DSM Pitching test, Sonic coring