Major Performance
-
Singapore Downtown Line Stage 2 Contract 915 / Shield Tunnel
-
Period
2010.01 ~ 2015.07
-
Client
LTA
-
Location
Singapore
-
Explanation
Slurry : Length - 4,634(M), Diameter - 6,650(mm)
Ground : Bukit timah Granite, Complex Stratum
-
Korea Soyang River Dam Selective intake system Construction/ Headrace Tunnel and Intake Water Tower
-
Period
2010.01 ~ 2017.06
-
Client
Korea Water Resources Corporation
-
Location
Chuncheon Gangwon-do, Republic of Korea
-
Explanation
Sectional area : (vertical hole : 275㎡, Tunnel 72㎡)
Extended Length : (vertical hole : 46m, Tunnel : 70m)
Rock Type : Soft / Hard rock
-
Korea Cheongra A28block RCD
-
Period
2009.12 ~ 2010.04
-
Client
Hunghwa Co.
-
Location
Incheon, Republic of Korea
-
Explanation
D1500 40hole 36M
D2000 129hole 32.8M
Oscillator+BG+R.C.D
-
Cambodia The Construction of Pile Work and Earth Work of The Branch of POSCO E&C the # Star River Project
-
Period
2009.11 ~ 2010.11
-
Client
Daesan Cambodia Co
-
Location
Cambodia
-
Explanation
Bored Pile
-
Singapore Marina Coastal Expressway CONTRACT 482 / DCM
-
Period
2009.08 ~ 2010.06
-
Client
LTA
-
Location
Singapore
-
Explanation
DCM Length :
Construction 172,369m
improvement 428,164m
(D=1,200mm, 2 drives)
-
Korea Seoul-Busan High Speed Railway 10-1
-
Period
2009.07 ~ 2014.04
-
Client
Korea Rail Network Authority
-
Location
Gyeongbuk, Republic of Korea
-
Explanation
Sectional area : 122㎡
Extended Length : 3,860m(Main Tunnel 3,810m, Open Cut Tunnel 50m)
Rock Type : Hard Rock