Major Performance
-
Korea Construction for South breakwater (Section 2-2) of Ulsan New Port
-
Period
2018.01 ~ 2020.12
-
Client
Ulsan Regional Office of Oceans and Fisheries
-
Location
Ulsan, Republic of Korea
-
Explanation
Deep Cement Mixing Method
(Long Pile) : 323,078M
(Short Pile) : 64,763M
-
Korea Tangjeong 2nd District Joint District SHIELD TBM
-
Period
2017.12 ~ 2021.09
-
Client
Samsung Display
-
Location
Asan, Chungcheongnam-do, Republic of Korea
-
Explanation
Total excavation: L= 2,5959m (Slurry TBM 1st (Slurry TBM 1)
- refractive diameter: D=7,660 mm
- Commercial tunnel: L= 1,2797.9m
- Har Line tunnel: L= 1,2797.9m
a refugee connection passage (and two sides)
-
Singapore Thomson East Coast Line T307 Bored Tunnel
-
Period
2017.12 ~ 2020.02
-
Client
LTA
-
Location
Singapore
-
Explanation
EPB, length-10.2(m), diameter-6,685(mm)
Ground : Marine Clay
-
Korea Goseong hai thermal power plant / Intake Shield TBM
-
Period
2017.11 ~ 2020.01
-
Client
Goseong Green Power
-
Location
Goseong, Gyeongsangnam-do, Republic of Korea
-
Explanation
EPB TYPE (D=8,240mm / L=790m)
- Excavation Diameter : D=8,240mm
Arrival area Cassion fabrication and mounting, water intake tower mounting
-
Korea Busan Gangseo Electric Supply Facility Power Cable Tunnel Construction Project(Daejeo-Bungi)
-
Period
2017.10 ~ 2020.10
-
Client
KEPCO
-
Location
Busan, Republic of Korea
-
Explanation
1 Shaft, Shield TBM 1656m, NATM 9m
-
Korea Busan New Port New Dredging Ground Marine DCM
-
Period
2017.06 ~ 2020.02
-
Client
Busan Regional Office of Oceans and Fisheries
-
Location
Changwon, Gyeongsangnam-do, Republic of Korea
-
Explanation
DCM : L = 304,859m
(D=1,200mm*4drivers)