Major Performance

  • Korea Construction for South breakwater (Section 2-2) of Ulsan New Port

    • Period 2018.01 ~ 2020.12
    • Client Ulsan Regional Office of Oceans and Fisheries
    • Location Ulsan, Republic of Korea
    • Explanation Deep Cement Mixing Method
      (Long Pile) : 323,078M
      (Short Pile) : 64,763M
  • Korea Tangjeong 2nd District Joint District SHIELD TBM

    • Period 2017.12 ~ 2021.09
    • Client Samsung Display
    • Location Asan, Chungcheongnam-do, Republic of Korea
    • Explanation Total excavation: L= 2,5959m (Slurry TBM 1st (Slurry TBM 1)
      - refractive diameter: D=7,660 mm
      - Commercial tunnel: L= 1,2797.9m
      - Har Line tunnel: L= 1,2797.9m
      a refugee connection passage (and two sides)
  • Singapore Thomson East Coast Line T307 Bored Tunnel

    • Period 2017.12 ~ 2020.02
    • Client LTA
    • Location Singapore
    • Explanation EPB, length-10.2(m), diameter-6,685(mm)
      Ground : Marine Clay
  • Korea Goseong hai thermal power plant / Intake Shield TBM

    • Period 2017.11 ~ 2020.01
    • Client Goseong Green Power
    • Location Goseong, Gyeongsangnam-do, Republic of Korea
    • Explanation EPB TYPE (D=8,240mm / L=790m)
         - Excavation Diameter : D=8,240mm
      Arrival area Cassion fabrication and mounting, water intake tower mounting
  • Korea Busan Gangseo Electric Supply Facility Power Cable Tunnel Construction Project(Daejeo-Bungi)

    • Period 2017.10 ~ 2020.10
    • Client KEPCO
    • Location Busan, Republic of Korea
    • Explanation 1 Shaft, Shield TBM 1656m, NATM 9m
  • Korea Busan New Port New Dredging Ground Marine DCM

    • Period 2017.06 ~ 2020.02
    • Client Busan Regional Office of Oceans and Fisheries
    • Location Changwon, Gyeongsangnam-do, Republic of Korea
    • Explanation DCM : L = 304,859m
      (D=1,200mm*4drivers)