Summary
This method can prevent the collapse and settlement of the ground injecting several stabilizers during excavation. In addition, it completed the tunnel after the excavation, segmented lining is installed repetitive from the rear part of the shield TBM. Especially, this method minimize works on the ground so there is a little noise, vibration, dust, pollution and traffic hazard. Also, It is possible to construct more curved and steep tunnel and tunneling under river, sea, buildings, etc. is made easy. Moreover, the process is repetitive, so that most of the works can be automated and easily managed.
Major Projects
-
Korea Construction of the Gimpo-Paju Expressway 2
-
Korea Installation of the Nakdonggang River Crossing Water Pipeline of Vertical District and Shield TBM Tunnel Construction
-
Korea Construction of Byeolnae Line (Extension of Line 8) Section 2
-
Korea Goseong hai thermal power plant / Intake Shield TBM
-
Singapore PUB D1200 Pipeline
-
Korea Dangjin~Pyeongtaek area Electric Power Transmission Cable Tunnel